Project Overview 

The Pennsylvania Department of Transportation (PennDOT) invites the public to  a virtual plans display for Route 6, Section P01, over Norfolk Southern Railroad in Clarks Summit Borough, Lackawanna County.

The proposed alternative is to repair the existing bridge and includes concrete deck repair with the application of an epoxy overlay to the bridge deck/sidewalk, substructure concrete repairs, bridge cleaning, spot painting of steel beams, and refacing concrete retaining walls adjacent to the bridge. Roadway improvements associated with the project include the repair of the protective fence adjacent to the sidewalk crossing the bridge and minor pavement grade adjustments to accommodate the new bridge overlay. No changes to existing guide rail/bridge barriers are anticipated and utility relocations will not be necessary to construct the project.

Historical or cultural resources present within the project site include the eligible Norfolk Southern Railroad and Trolley Trail, both of which will be treated as 4(f) resources on this project. There are no wetlands present within the project limits and no other environmentally sensitive resources will be affected.

The deck repairs and overlay application is expected to be constructed in three stages while always maintaining two lanes of vehicular traffic. Pedestrian traffic will be maintained at all times during construction and will be protected on the bridge deck during the application of the overlay on the sidewalk. Access to adjacent driveways and intersections will be maintained throughout the project. 

The project is currently in design and is planned to be let in Summer 2024. Construction work is anticipated to be completed by end of summer of 2025.

Public Meeting

The virtual plans display will be held online and will be available from October 2, 2023, to November 3, 2023

The public is encouraged to respond to the public questionnaire and provide comments by clicking on the Public Questionnaire to print a PDF questionnaire to be completed by hand and mailed  to the address at the bottom of the form or emailed to creuther@pa.gov .  The comment period will range from October 2, 2023, to November 3, 2023. 

Resources

Project Plans (PDF)

Map View (PDF)

Construction Stages (PDF)


Comments

Comment Form (PDF)


Project Information

County: Lackawanna

State Route:  6

Project Type: Bridge Rehabilitation
Expected Construction Season: 2024


Contact Information

Project Manager, Charles Reuther

 | creuther@pa.gov

Press Officer, Jessica Ruddy

(570) 963-4044 | jeruddy@pa.gov


Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention the contact the project.


Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.