Project Overview
The purpose of the project is to provide reliable and efficient transportation facilities for motorized traffic as well as pedestrians and bicyclists.
The project will include resurfacing, restoration, and rehabilitation of the existing pavement and roadway, intersection improvements, and signal updates on Route 62/322 (Liberty Street and 15th Street) from the intersection of 15th Street (Route 8) and Mercer Road (Route 62) in Sandycreek Township to the intersection of Liberty Street (Route 322) and 8th Street (Route 322) in the City of Franklin. The project will also include minor intersection widening to accommodate truck off-tracking at 15th Street and intersection improvements at 12th Street intersection to reduce pedestrian crossing lengths and improve the geometry of the roadway.
Work is expected to occur in 2026 construction season.
Public Meeting
An in-person public meeting was held November 30, 2023. A presentation was given and attendees were given the opportunity to ask questions. The presentation was boards that were on display are available below.
Traffic Impacts
No detours are expected in connection with the project, but there will be lane restrictions and traffic controlled by flaggers.
Display Boards
Click on the picture for a PDF version of the display boards.
Presentation
Opens In A New Window
Comments
Submit Comments
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, or have special needs or have special concerns that require individual attention, contact the project manager.
Contact Information
Project Manager, Steve Schettler
814-678-7356 | sschettler@pa.gov
Press Officer, Jill Harry
814-678-5035 | jharry@pa.gov