Interstate 80 over Route 93 Bridge Replacement Project

3B-4B Roadway Plan (002).jpg

Project Overview

The project consists of the replacement of the Interstate 80 eastbound and westbound bridges over Route 93, in Sugarloaf Township, Luzerne County, PA. The existing bridges are three-span prestressed I-beam bridges with overall structure lengths of 210' (EB) and 202' (WB). The existing structures are in poor condition and do not meet current design standards. The project also includes an extension of acceleration lanes carrying Route 93 northbound to Route 80 westbound and Route 93 southbound to Interstate 80 eastbound, realignment of the Interstate 80 westbound off-ramp to a new, signalized intersection with Route 93 and Old Berwick Road, and pavement reconstruction on Route 93 within the interchange area.

The purpose of the project is to provide a sustainable travel way/crossing which meets current design standards to provide a safe and efficient highway system for motorists.

During construction, overnight lane closures, short-term overnight detours, stop control configurations, and ramp detours are anticipated.

It is anticipated that construction will begin in early 2026.

Public Meeting and Plans Display

Public plans display and project presentation will take place at:

  • Time:   5:00 - 6:30 PM (Plans Display), 6:30 PM (Presentation at the Sugarloaf Township Supervisors Meeting)
  • Date:    July 18, 2023
  • Location: Sugarloaf Township Building, 858 Main Street, Sugarloaf PA 18249

The purpose of the plans display is to introduce the project, display and describe how traffic will be maintained during construction, and receive public input regarding the proposed improvements.  Project information flyers and comment forms will be available at the Township office and on the project webpage.

The project plans will remain on display at the township building for approximately 2-weeks, until August 1, 2023.

The information provided during the in-person plans display (display boards, project information sheet, and public comment form) can be accessed virtually by clicking the links under the "Resources" section in the upper right side of this webpage.

The deadline for submitting official comments is August 18, 2023.

Traffic Control

Overnight lane closures, short term overnight detours, stop control configurations, and ramp detours are anticipated.

Interstate 80 EB & WB:  Overnight temporary right lane closures to pick new beams off of the Interstate 80 right lane for placement of beams in the first stage of construction. Overnight temporary left lane closures for placement of beams in the second stage of construction.

Route 93:  A long-term single lane closure and shoulder closure, in addition to 15-minute rolling stops for pier construction and temporary shoring. Additionally, short-term overnight detours are required for the existing bridge demo and new beam placement.

Ramps: Temporary realignment of Ramp D and Ramp H is required. Additionally, stop control will be implemented on Ramp A, Ramp D, and Ramp H. The existing stop control configurations for the Ramp C and Old Berwick Road intersection will be maintained during construction. Ramp E will be detoured during the construction of the northbound side of Route 93. The detour will utilize Interstate 80 WB and EB up to and back from the Mifflinville Interchange.

The detour maps can be accessed virtually by clicking on the Plans Display link under the "Resources" section on the upper right side of this webpage. 

Resources

Plans Display (PDF)
Project information Sheet (PDF)
Public Comment Form (PDF)


Project Information

County: Luzerne

State Route:  Interstate 80

Project Type: Bridge Replacement
Expected Start of Construction: 2026


Contact Information

Consultant Project Manager, Kelley Sartori

570-335-9244 | 

c-kesartor@pa.gov

Press Officer, Jessica Ruddy

570-963-4044 | jeruddy@pa.gov


Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation / interpretation services or have special needs or have special concerns that require individual attention the contact PennDOT Consultant Project Manager, Kelley Sartori, P.E., at 570-335-9244 or c-kesartor@pa.gov.


Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.