Earlier this year, Erie County-based District 1 opened a single-lane roundabout as the final, major piece of PennDOT’s six-year, $28.1 million project focused on improving safety, efficiency, and the streetscape of the Route 718/Route 760 corridor in the Mercer County communities of Wheatland, Farrell, and Sharon.

Known as the Broadway Avenue Improvement Project, work started in 2012 and was completed in three phases. 

  • Phase 1 (2012-2013) – Completed in two stages on Broadway Avenue/Martin Luther King Jr. Boulevard at a cost of approximately $9.2 million. Stage one went from Council Avenue in Wheatland to Fruit Avenue in Farrell. Stage two went from Fruit Avenue in Farrell to Roemer Boulevard in Farrell.  
  • Phase 2 (2015-2016) – Completed in three stages on Martin Luther King Jr. Boulevard at a cost of approximately $7.3 million. Stage one went from Roemer Boulevard in Farrell to Union Street in Farrell. Stages two and three went from Union Street in Farrell to Malleable Street in Sharon.
  • Phase 3 (2017-2018) – Completed in two stages at a cost of approximately $4.1 million. Stage one involved the area of South Dock Street from Orchard Street to the entrance of the Metalico recycling plant. Stage two went from the recycling plant to Bank Place and included the construction of a roundabout at the intersection of South Dock Street and Connelly Boulevard.  

“The roundabout is the capstone of this major project, which included highway reconstruction, addition of a center turn lane, turning radius improvements at intersections, new sidewalks and curb ramps,” said Jim Foringer, District Executive for PennDOT’s northwest region. “PennDOT is proud to make this investment into the business and residential communities of Mercer County as part of the state’s commitment to providing a government that works and jobs that pay.” 

The work also included streetscape upgrades to drainage, traffic signals, decorative highway lighting, signs, as well as pear tree plantings. 

Kirila Contractors Inc. of Brookfield, Ohio, was the contractor for all three phases of the project. SAI Consulting Engineers of Pittsburgh was the design consultant, and Quality Engineering Solutions of Conneaut Lake, Pa., was the inspection contractor. 

Design and inspection costs for the six-year project were approximately $7.6 million.

PennDOT marked the opening of the roundabout by partnering with the Shenango Valley Chamber of Commerce to host a public ceremony and ribbon cutting.

“We thank both the community officials and residents of Wheatland, Farrell and Sharon for their patience during the reconstruction of the corridor the last several years,” said Reggie Jannetti, PennDOT Project Engineer. “It is exciting to be part of the team to construct the first roundabout in Mercer County, because of its proven increased efficiency and safety.”

ABOUT THIS BLOG

Did you know PennDOT is directly responsible for nearly 40,000 miles of highway and roughly 25,000 bridges? We oversee programs and policies affecting highways, urban and rural public transportation, airports, railroads, ports and waterways, in addition to administering the state's more than 11 million vehicle registrations and 8.8 million driver's licenses.

So, how do we do what we do? And how can we help you travel in Pennsylvania — whether it be for business or leisure — in safe and enjoyable manner? Read PennDOT Way to learn more about the department, what we do, and how and why we do it.​

TAGS

50-Year Anniversary511PAAggressive DrivingAirportsAutonomous VehiclesBicyclesBridgesChild SafetyCommunity RelationsConstructionCOVID-19Distracted DrivingDistrict 1District 10District 11District 12District 2District 3District 4District 5District 6District 8District 9DOTcomDriver and Vehicle ServicesEmergency RespondersEmploymentEquityFAQ FridayHuman TraffickingImpaired DrivingInnovationsLive Free Ride AliveMaintenance MondayMotorcyclesOlder DriversPA Motorcycle Safety ProgramPedestriansPennDOT ConnectsPortsPublic TransitRailroadsREAL IDRoad MaPRoadside BeautificationRural RoadsSafetySchool BusesSeat BeltsState Transportation Innovation Council (STIC)SustainabilityTeen DriversThrowback ThursdayTransportation FundingTravel in PAWelcome CentersWinterWork SmartWork ZoneYellow Dot

 

LATEST POSTS

PennDOT Continues Sharing, Updating Resources for Local Governments to Pursue Bipartisan Infrastructure Law Funding Opportunities
Norwin High School Wins 2024 ‘Innovations Challenge’
Demo Complete: I-95 CAP Project in Center City Philadelphia
PennDOT Archeologist Connects Past, Present, and Future
Lehigh Valley DUI, Highway Safety Task Force Hosts Law Enforcement Seminar

 

ARCHIVES

2024

2023

2022

2021

2020

2019

2018

2017