For this phase of the directive, we are piloting the process of developing model-based deliverables for construction contracts using the OpenBridge Designer software, which includes analysis, 3D modeling and detailing tools. The objectives of this project are to develop a 3D model as complete as possible to reproduce the content traditionally conveyed through plan sheets; evaluate the Bentley software stack, and enable contractor use of the model.
Selected Pilot Projects:
Project | District | County | SR-Section | Description | Let Date |
---|---|---|---|---|---|
114138 | 1 | Crawford | 1032-B00 | SR 1032 Bridge over Shirley Run | 12/14/2023 |
8308 | 4 | Lackawanna | 3006-250 | SR 3006 over Gardner Creek | 07/27/2023 |