Project Description

The I-80 Canoe Creek bridges are dual multi-span structures (one eastbound and one westbound) that were built in 1966, were extended in 1985 and underwent multiple retrofits for fatigue-induced cracking since 2013. These bridges cross over Canoe Creek and Tippecanoe Road (SR 4005) in Beaver Township, Clarion County. Combined, they will carry an estimated average of 30,100 vehicles per day by 2025. About 50 percent of the traffic over these bridges is truck traffic.

The purpose of the I-80 Canoe Creek Bridges project is to provide a safe and reliable crossing of I-80 over Canoe Creek and Tippecanoe Road. The project is intended to replace the existing structures and update the roadway within the project limits to meet current design criteria and improve safety along the corridor. While both bridges have been repaired several times throughout their lifespan, recent inspections show the westbound bridge is in poor condition, and the eastbound bridge is in fair condition.

The project includes the total replacement of both the eastbound and westbound Canoe Creek bridges, as well as improved roadway alignment and geometry. The limits of the project extend approximately three miles on I-80, from the Knox interchange over the bridges to a pair of weigh stations near milepost 56.5. Part of the project also includes the rehabilitation of an existing reinforced concrete arch culvert (Thompson Hill Arch Culvert) that carries an unnamed tributary to Canoe Creek under I-80. The existing wingwalls at the inlet and outlet of the culvert are deteriorated and will be replaced. In addition, a reinforced concrete slab will be constructed along the floor of the culvert to prevent further scour of the streambed within the limits of the culvert.

Stay Informed

To stay informed or to be added to the project mailing list, please complete the form at the bottom of this page. You may also submit comments and feedback by using this form.













​Project Information

County: Clarion

State Route: SR0080-365 (Interstate 80)

Local Name: I-80 Canoe Creek Bridges

Project Type: Bridge Replacement, Culvert Rehabilitation

Design and Construction Cost: $252.2 million

Anticipated Construction Start: Fall 2023

Anticipated Bridge Completion: Fall 2027

Designer: Michael Baker International

Last Updated: December 2023

View Project History & Funding


Detour Information

No detour route is planned for I-80 during project construction. However, there may be some short-term intermittent detours on Tippecanoe Road. Detours will be communicated as needed throughout the project. 


Meetings

October 2023 Public Meeting Presentation (PDF)

October 2023 Public Meeting



Resources

Project Area Map (PDF)

SR 4005 (Tippecanoe Road) Detour Route (PDF)

What is the National Environmental Policy Act?

What is a Categorical Exclusion (CE)?

What is a CE Reevaluation?

I-80 Canoe Creek Categorical Exclusion Documentation (PDF)

Approved CE Revaluation - October 2022 (PDF)

I-80 Canoe Creek Categorical Exclusion Reevaluation Information - Fall 2022