In District 3, 129 projects are underway or expected to start or go out for bid this year, with a total value of $626.6 million. You can find weekly updates of planned department maintenance activities on the District 3 page.

 

25

Bridges Repaired, Replaced, or Preserved*

129

Projects +

$626.6

Million in Projects +

+ Underway or expected to start or go out for bid this year in District 3 | * From January 2024 Through March 2024

25 bridges were repaired, replaced, or preserved by PennDOT or industry forces through March 2024. See projects happening or planned near you at PennDOT's Project Website.

From January through December 2024, one construction contract for highway, bridge, and other improvement projects was completed in the district through PennDOT's private-sector partners.

  •   How Do We Calculate These Numbers?

    Each quarter, PennDOT reports miles improved and paved, and bridges improved.

    For pavements, miles improved includes seal coats, micro-surfacing, thin lift paving, and regular paving conducted both by department force and contractors. Paved miles are only those receiving a new resurfacing. Once the projects are completed, they are closed and entered in our databases. However, oftentimes improvements and paving projects have additional work items that need to be completed, and all payments and accounting must be finalized before the projects are closed. Therefore, the reported improved miles or paving may be well after the paving or improvement portion of the project has been completed.

    For bridge improvement, PennDOT reports projects that are "let,"" which means that they were made available for bid. Bridge projects sometimes span many years, so the most reliable means of measuring the progress of our program is reporting how many bridges are let in a given period.

Featured Projects

Route 4001-020

Cost: $10.8 million

County: Lycoming

State Route 199-010

Cost: $16.4 million

County: Bradford

Route 15-88D
Route 15-88E

Cost: $115.2 million (15-88D), $106.4 million (15-88E)

County: Snyder and Union

Route 4001-020

Image of a car traveling on a roadway in Lycoming County, Pennsylvania.

TThis is a four-year bridge rehabilitation project of the bridge carrying Route 4001 (Little Pine Creek Road) over Little Pine Creek in Pine Township.

Work began on the project in the fall of 2023 with minor preparation work. In the spring of 2024, the contractor started pile installation for the temporary bridge foundations. The temporary bridge will carry traffic during the rehabilitation of the suspension bridge.

The bridge, which is listed on the National Historic Landmarks and National Register of Historic places in Pennsylvania, was built in 1891. It will be disassembled, and parts and pieces will be sent away to the fabricator for cleaning and upgrades. The bridge will then be reassembled, and the temporary roadway will be removed. Once completed, the structure’s weight restriction will increase from 3 to 10 tons.

Work on this project is anticipated to be completed in the fall of 2026.

Cost: $10.8 million

County: Lycoming

State Route 199-010

Sidewalk construction in process along PA State Route 199-010.

This multi-year reconstruction of 2.6-miles of Route 199 from the New York state line in Sayre Borough to just north of the Norfolk Southern Railroad tracks (near the Agway) in Athens Borough, began in the fall of 2020.

Final work on Stages 3, 2, and 1 will begin in April of 2024. Work planned this season includes:

ul>
  • Stage 3, between Vanderbilt Street and Pine Street, Athens Borough will begin in April of 2024. Work will be completed in half widths with the southbound traffic using Route 199 and the northbound traffic detoured onto various routes as the construction phases progress.
  • Stage 2, between Pine Street and Spruce Street, Athens Borough is set to begin in mid-summer of 2024. Work will be completed in half widths with the southbound traffic using Route 199 and the northbound traffic detoured onto various routes as the construction phases progress.
  • Stage 1, between Spruce Street and 350 ft North of Satterlee Street, Athens Borough is set to begin in late summer of 2024. Work will be completed in half widths with the southbound traffic using Route 199 and the northbound traffic detoured onto various routes as the construction phases progress.
  • The reconstruction project includes new curbing, ADA accommodations at intersections (where appropriate), improved drainage, signal upgrades at three intersections, utility upgrades, new paving, and line painting.

    Work is anticipated to be completed in the fall of 2024. Work is expected to be completed in the fall of 2024.

    Cost: $16.4 million

    County: Bradford

    More About the State Route 199-010 Project

Route 15-88D

A large construction vehicle places and smoothes asphalt onto a milled roadway.

These are the first two of three primary contracts for the Central Susquehanna Valley Transportation (CSVT) Project’s Southern Section. These $221.5 million contracts include 4.5 million cubic yards of earthwork and new bridges for the new section of Route 15 between Selinsgrove and Winfield. The Southern Section will tie into the recently opened Northern Section of CSVT which connects Route 15 near Winfield, Union County to Route 147 near Montandon, Northumberland County.

The first contract includes installing drainage throughout the project, constructing erosion and sediment pollution control structures, constructing one new bridge over CSVT, constructing three box culverts, and realigning a few local roads.

The first contract is currently 75% complete with earthwork and drainage south of Mill Road finished. In late 2023 a new bridge was constructed that carries Sunbury Road over the future CSVT, realignment of Park Road, and the two roundabouts on Mill and App Roads. The roadway connecting the roundabouts is anticipated to be opened in the spring of 2024.

Work began in Summer 2022 and is anticipated to be completed in 2025.

Cost: Route 15-88D - $115.2 million, Route 15-88E - $106.4 million

County: Snyder and Union

More About the Route 15-88D Project

PennDOT's Engineering District 3 is responsible for the state-maintained transportation network in this region. This includes 4,500 road miles and 2,901 bridges.

We also work with local governments, elected officials, stakeholders and the public on keeping people and goods moving safely and efficiently in this region.

4,500

State-Maintained Road Miles

2,901

State-Maintained Bridges

948

Employees*

* Filled salaried positions. Does not include wage jobs, which fluctuate seasonally.

Stay Informed

PennDOT's 11 Engineering Districts throughout the state maintain, restore, and expand the state's highway systems. Each office does its part to deliver a safe and efficient transportation system on the nearly 40,000 miles of highway and rougly 25,400 bridges that PennDOT is reponsible for. More information about PennDOT's operations and the state highway system is available in PennDOT's Fact Book (PDF).