North Valley Road Bridge Replacement Project
Project Location
Overview
This project will look to replace the existing bridge carrying North Valley Road (SR 1005) over Amtrak/SEPTA railroad tracks with a new bridge over the railroad and new roadway extension from the intersection of Lancaster Avenue and Darby Road in Tredyffrin and Willistown townships, Chester County. The project also includes improvements at the offset intersection of East Central Avenue and West Central Avenue with North Valley Road; improvements to the existing parking areas for the train station; new access roadways under the North Darby Road extension for a future parking garage; traffic signal modifications at North Valley Road/Lancaster Avenue and Darby Road/Lancaster Avenue; removal of the existing North Valley Road Bridge; and modifications of North Valley Road between Lancaster Avenue and the railroad.
The overall Paoli Transportation Center program includes three phases. Phase 1 was construction of a pedestrian bridge and ADA improvements at the station building which was completed in 2019. Phase 2 includes this PennDOT project including the highway improvements and relocation of North Valley Road. Phase 3 is a potential future parking garage in the area of the south parking lot adjacent to Lancaster Avenue. All three phase are being developed in cooperation with Amtrak and SEPTA.
Public Outreach
PennDOT held a live virtual public meeting on Wednesday, January 17, 2024, to deliver a presentation on this improvement project, which included scope of work, timeline and funding. The project team also answered questions using the platform's chat feature.
Members of the public who are unable to attend the online meeting can view the recording and a copy of the materials on this webpage . The public can also provide feedback using the online comment form.
Renderings
Resources
(PDF)
Project FAQ (PDF)
Project Presentation (PDF)
Detour Plans (PDF)
Project Information
County: Chester
State Route(s): U.S. 30, Route 1005, Route 1053
Local Name(s): Lancaster Avenue, N Valley Road, W Central Avenue
Project Type: Bridge Relocation and Roundabout Construction
Project Contact
Project Manager, Mirlene Saintval
Phone: 610-205-6820
Email: msaintval@pa.gov
Accessibility
The project documents will be made available in alternative languages or formats if requested. If you need translation and/ or interpretation services, have special needs or concerns that require individual attention, contact the PennDOT Project Manager.